Naheola Biomass Ductwork

This steel plate duct work system, weighing 150 tons, was made up of gas flow spaces up to 33’ wide and a max of 9’-2 deep that included interfaces at the Boiler Outlet, Filter Fabric House Inlet and Outlet, Dual ID Fan Inlet, Fan Outlet, and Stack Inlet. The duct work included flat and rolled…

Second Line Stages Expansion

NAFCO provided steel detailing and fabricaiton for the trusses and structural steel on the Second Line Stages studio expansion in New Orleans, LA. NAFCO worked with the design team and general contractor to secure materials, provide connection design, fabricate and arrange just-in-time deliveries to maximize a tight schedule and limited on-site lay down room. Check…

CPS Energy

NAFCO contracted for the design, supply, electrical design, detailing, fabrication and installation of the entire material handling system for CPS Energy at the Calaveras Lake Generating Station near San Antonio, Texas.  They system which allows CPS to receive shipments of coal and transport it to the power plant.  The project included the construction of a…

Cliff’s Oak Grove

NAFCO contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by the tornadoes that swept through Alabama in April 2011. The scope of this project included the engineering, manufacturing, and installation of a 54-inch-belt-width plant feed conveyor, a 48-inch-belt-width refuse conveyor, a 48-inch-belt-width…

Bryant Denny Stadium Renovations

NAFCO provided detailing, fabrication and erection for the Bryant Denny Stadium expansion and renovations in 2020. This unique and intricate project included stadium expansions and retrofitting the existing stadium to feature more luxury boxes. NAFCO’s team worked through COVID-19 and multiple on-site challenges to expedite the erection schedule and deliver a high-quality project in time…

Birmingham News Building

NAFCO fabricated and delivered the entrance façade and the interior bridges that connected the two individual office areas for this landmark building.  Originally built for the Birmingham News in downtown Birmingham.  An Architecturally exposed stainless steel awning accents the entrance. Stats Location: Birmingham, AL Total Tons: 400 Gallery

Auburn University

In 2015 NAFCO worked with Auburn University to complete the fabrication and erection of the new Jordan-Hare Stadium Scoreboard, which is still the largest in all of college football. In spite of delays in design and by other contractors, NAFCO worked around the clock in both fabrication and erection to meet the project’s very aggressive…

Marshall Space Flight Center

NAFCO joined the mssions to Mars through the work completed for NASA’s test stands at the Marshall Space Flight Center in Huntsville, AL. This three year project included the detailing, connection design, fabrication and erection of over 4,500 tons of steel. The test stands will be used for static testing of the liquid oxygen and…