Schenck Silos

NAFCO designed, detailed, fabricated and delivered this 14′ diameter, 84′ long chemical storage silo. It is a skirted design with 4 integrated columns provided for load cells interface at grade. The columns had adjacent jacking positions to allow for complete load cell replacement even during a full silo event. The Silo was designed for an…

Naheola Biomass Ductwork

This steel plate duct work system, weighing 150 tons, was made up of gas flow spaces up to 33’ wide and a max of 9’-2 deep that included interfaces at the Boiler Outlet, Filter Fabric House Inlet and Outlet, Dual ID Fan Inlet, Fan Outlet, and Stack Inlet. The duct work included flat and rolled…

CPS Energy

NAFCO contracted for the design, supply, electrical design, detailing, fabrication and installation of the entire material handling system for CPS Energy at the Calaveras Lake Generating Station near San Antonio, Texas.  They system which allows CPS to receive shipments of coal and transport it to the power plant.  The project included the construction of a…

Kryger Creek Power Station

Material handling systems supporting Flue-gas desulfurization (FDG) installation consisting of Limestone Receiving Conveyor, LS Transfer Conveyors, LS Delivery Conveyors, Gypsum Waste Reclaim Conveyor and Gypsum Stackout Conveyor with enclosed galleries, bents, receiving hoppers, transfer towers and transition Chutework. Stats Location: Cheshire, OH In Service: 2007 Total Tons: 850 Gallery

Oxbow – Enid

In August 2014, Wolf Point Engineers & Contractors contracted with Oxbow Calcining LLC for complete engineering, procurement, installation and commissioning (EPC) for a new screening, crushing, storage and rail loading system to be incorporated into their existing calcining facility located near Enid, Oklahoma. The new system utilizes a series of five bucket elevators and five…

TPS Sand Plant

NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin.  The project included two 48” conveyors with transfer towers, screening building, and associated chutework.  The project included 1,600 tons of steel with a two coat sophisticated paint system applied for corrosion protection.  (See Pictures from WPE W…

SteelRidge Center

Start-to-finish, NAFCO provided turnkey architectural coordination, structural engineering, detailing, fabrication, coating and erection of our corporate headquarters in Birmingham, AL. The steel-framed building features architecturally exposed steel columns, braces and trusses throughout the structure to showcase our business. In depth coordination during connection design and detailing helped support erection completion in less than 5 weeks,…

Sooner Generation Plant Conveyor Replacement

NAFCO and Wolf Point Engineers worked together to fully engineer, procure and construct the conveyor 10 and 11 replacements at Sooner Generation Plant. NAFCO detailed, fabricated, assembled and staged structural steel and over 2,100 feet of 12.5′ diameter tubular galleries containing two 36-inch conveyors to support a ten week outage installation. During the ten weeks,…

Zen-Noh Lift Bridge

NAFCO’s Birmingham engineering team worked with our customers to fully design this lift bridge in Convent, LA. Our scope of work included structural and mechanical design, steel fabrication, shop assembly of mechanical components, multi-coat painting and delivery. Stats Location: Convent, LA In Service: 2018 Total Tons: 75 Gallery