Cliff’s Oak Grove

NAFCO contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by the tornadoes that swept through Alabama in April 2011. The scope of this project included the engineering, manufacturing, and installation of a 54-inch-belt-width plant feed conveyor, a 48-inch-belt-width refuse conveyor, a 48-inch-belt-width…

Cliff’s Bloom Lake

NAFCO fabricated and delivered 5,500 tons of structural steel for a iron ore conveyor and loadout storage structure in Quebec, Canada.  All material was provided as cold weather steel due to the inclement weather conditions for the area.  A two coat sophisticated paint system was applied in the shop for additional corrosion protection.  NAFCO utilized…

Birmingham News Building

NAFCO fabricated and delivered the entrance façade and the interior bridges that connected the two individual office areas for this landmark building.  Originally built for the Birmingham News in downtown Birmingham.  An Architecturally exposed stainless steel awning accents the entrance. Stats Location: Birmingham, AL Total Tons: 400 Gallery

Smithfield Foods

This train unloading conveyor system for Smithfield Foods at their Rose Hill, NC facility for the purpose of unloading and trucking feed. The project consisted of 500 tons of steel for the train unloading structure, (7) 36” conveyor trusses, (5) 30” conveyor trusses, bents & Transfer towers. The project also included a 30” underground reclaim…

Marshall Space Flight Center

NAFCO joined the mssions to Mars through the work completed for NASA’s test stands at the Marshall Space Flight Center in Huntsville, AL. This three year project included the detailing, connection design, fabrication and erection of over 4,500 tons of steel. The test stands will be used for static testing of the liquid oxygen and…

Merrimack Power Station

NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project.  The project consisted of nine different conveyors, five of which are tubular galleries which varied in size from 9’-6” to 10’-6” in diameter.  The total length of tubular galleries was more than 1,600…

Oxbow – Enid

In August 2014, Wolf Point Engineers & Contractors contracted with Oxbow Calcining LLC for complete engineering, procurement, installation and commissioning (EPC) for a new screening, crushing, storage and rail loading system to be incorporated into their existing calcining facility located near Enid, Oklahoma. The new system utilizes a series of five bucket elevators and five…

TPS Sand Plant

NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin.  The project included two 48” conveyors with transfer towers, screening building, and associated chutework.  The project included 1,600 tons of steel with a two coat sophisticated paint system applied for corrosion protection.  (See Pictures from WPE W…