Osprey Aircraft Hangars

NAFCO worked on multiple projects from 2003 through 2009 to detail, fabricate and erect hangars for Osprey Aircraft. These large hangars featured prismatic pipe trusses that were fully field-bolted, reducing cost and improving schedule. After initial fit-up, NAFCO trial-fit these 200′ trusses together at our shop facility to verify jig accuracy before final welding, painting,…

Emory Winship Pedestrian Bridge

NAFCO fabricated and delivered this fully architecturally exposed pedestrian bridge to the heart of Atlanta for Emory University hospitals. The project features custom-milled, solid steel nodes, which were full-penetration welded in geometrically complex arrangements to highlight the aesthetic value of steel, which is exposed to view from inside and outside. Stats Location: Atlanta, GA In…

Hunter Army Air Field Hangar

This hangar project on Hunter Army Air Field features deep, long span trusses running perpindicular to one-another. NAFCO used a mix of shop and field assembled trusses and provided shop application of the sophisticated military paint system to minimize field work. Hangar erection was completed in a duration of under 3 months. Stats Location: Charleston,…

Project 904

NAFCO has worked closely with our clients, the design team and the project owner to fabricate and erect this 4,500+ ton project. Three-projects-in-one, NAFCO worked three distinct structures in parrallel to expedite project completion. This site was home to as many as 8 different cranes at once during the peak of erection. Stats Location: Orlando,…