Merrimack Power Station
NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project. The project consisted of nine different conveyors, five of which are tubular galleries which varied in size from 9’-6” to 10’-6” in diameter. The total length of tubular galleries was more than 1,600…