Auburn University

In 2015 NAFCO worked with Auburn University to complete the fabrication and erection of the new Jordan-Hare Stadium Scoreboard, which is still the largest in all of college football. In spite of delays in design and by other contractors, NAFCO worked around the clock in both fabrication and erection to meet the project’s very aggressive…

Marshall Space Flight Center

NAFCO joined the mssions to Mars through the work completed for NASA’s test stands at the Marshall Space Flight Center in Huntsville, AL. This three year project included the detailing, connection design, fabrication and erection of over 4,500 tons of steel. The test stands will be used for static testing of the liquid oxygen and…

Merrimack Power Station

NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project.  The project consisted of nine different conveyors, five of which are tubular galleries which varied in size from 9’-6” to 10’-6” in diameter.  The total length of tubular galleries was more than 1,600…

Kryger Creek Power Station

Material handling systems supporting Flue-gas desulfurization (FDG) installation consisting of Limestone Receiving Conveyor, LS Transfer Conveyors, LS Delivery Conveyors, Gypsum Waste Reclaim Conveyor and Gypsum Stackout Conveyor with enclosed galleries, bents, receiving hoppers, transfer towers and transition Chutework. Stats Location: Cheshire, OH In Service: 2007 Total Tons: 850 Gallery

Osprey Aircraft Hangars

NAFCO worked on multiple projects from 2003 through 2009 to detail, fabricate and erect hangars for Osprey Aircraft. These large hangars featured prismatic pipe trusses that were fully field-bolted, reducing cost and improving schedule. After initial fit-up, NAFCO trial-fit these 200′ trusses together at our shop facility to verify jig accuracy before final welding, painting,…

Oxbow – Enid

In August 2014, Wolf Point Engineers & Contractors contracted with Oxbow Calcining LLC for complete engineering, procurement, installation and commissioning (EPC) for a new screening, crushing, storage and rail loading system to be incorporated into their existing calcining facility located near Enid, Oklahoma. The new system utilizes a series of five bucket elevators and five…

TPS Sand Plant

NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin.  The project included two 48” conveyors with transfer towers, screening building, and associated chutework.  The project included 1,600 tons of steel with a two coat sophisticated paint system applied for corrosion protection.  (See Pictures from WPE W…

Project 904

NAFCO has worked closely with our clients, the design team and the project owner to fabricate and erect this 4,500+ ton project. Three-projects-in-one, NAFCO worked three distinct structures in parrallel to expedite project completion. This site was home to as many as 8 different cranes at once during the peak of erection. Stats Location: Orlando,…