NAFCO provided steel detailing and fabricaiton for the trusses and structural steel on the Second Line Stages studio expansion in New Orleans, LA. NAFCO worked with the design team and general contractor to secure materials, provide connection design, fabricate and arrange just-in-time deliveries to maximize a tight schedule and limited on-site lay down room. Check out the full ENR story at the link below:
https://www.enr.com/articles/54372-design-build-helps-accelerate-new-orleans-sound-stage-project