Emory Winship Pedestrian Bridge

NAFCO fabricated and delivered this fully architecturally exposed pedestrian bridge to the heart of Atlanta for Emory University hospitals. The project features custom-milled, solid steel nodes, which were full-penetration welded in geometrically complex arrangements to highlight the aesthetic value of steel, which is exposed to view from inside and outside. Stats Location: Atlanta, GA In…

SteelRidge Center

Start-to-finish, NAFCO provided turnkey architectural coordination, structural engineering, detailing, fabrication, coating and erection of our corporate headquarters in Birmingham, AL. The steel-framed building features architecturally exposed steel columns, braces and trusses throughout the structure to showcase our business. In depth coordination during connection design and detailing helped support erection completion in less than 5 weeks,…

Sooner Generation Plant Conveyor Replacement

NAFCO and Wolf Point Engineers worked together to fully engineer, procure and construct the conveyor 10 and 11 replacements at Sooner Generation Plant. NAFCO detailed, fabricated, assembled and staged structural steel and over 2,100 feet of 12.5′ diameter tubular galleries containing two 36-inch conveyors to support a ten week outage installation. During the ten weeks,…

Zen-Noh Lift Bridge

NAFCO’s Birmingham engineering team worked with our customers to fully design this lift bridge in Convent, LA. Our scope of work included structural and mechanical design, steel fabrication, shop assembly of mechanical components, multi-coat painting and delivery. Stats Location: Convent, LA In Service: 2018 Total Tons: 75 Gallery

Arch Coal, Inc.

In 2011, we were contracted to detail and fabricate all the required structural steel for a new preparation plant and load out facility. This included structural steel columns, beams, bracing, bins and plate work, miscellaneous steel, handrails, platforms, and grating, as well as a multi-coat paint system. When completed, this project featured approximately 3 million…

Destin Commons

In 2003, we completed the fabrication and erection of the structural steel for the Destin Commons retail center project in the coastal resort of Destin, Florida. The project included seven retail shop buildings with structural steel frame design and more than 1.5 million pounds of structural steel. We were responsible for both fabrication and erection…

Department of Navy, US Marine Corps

In 2004, we completed the fabrication and erection of a prismatic truss hangar, utilizing large-sized steel pipe, for the Department of the Navy in Norfolk, Virginia. The project included more than 1.7 million pounds of structural steel. In 2009, we were hired to fabricate and erect another hangar with a similar design for the Marine…

Cliff’s Natural Resources

In 2011, we contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by the tornadoes that swept through Alabama in April 2011. The scope of this project included the engineering, manufacturing, and installation of a 54-inch-belt-width plant feed conveyor, a 48-inch-belt-width refuse conveyor,…