Schenck Silos
NAFCO designed, detailed, fabricated and delivered this 14′ diameter, 84′ long chemical storage silo. It is a skirted design with 4 integrated columns provided for…
Naheola Biomass Ductwork
This steel plate duct work system, weighing 150 tons, was made up of gas flow spaces up to 33’ wide and a max of 9’-2…
Second Line Stages Expansion
NAFCO provided steel detailing and fabricaiton for the trusses and structural steel on the Second Line Stages studio expansion in New Orleans, LA. NAFCO worked…
CPS Energy
NAFCO contracted for the design, supply, electrical design, detailing, fabrication and installation of the entire material handling system for CPS Energy at the Calaveras Lake…
Cliff’s Oak Grove
NAFCO contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by the tornadoes…
Cliff’s Bloom Lake
NAFCO fabricated and delivered 5,500 tons of structural steel for a iron ore conveyor and loadout storage structure in Quebec, Canada. All material was provided…
Bryant Denny Stadium Renovations
NAFCO provided detailing, fabrication and erection for the Bryant Denny Stadium expansion and renovations in 2020. This unique and intricate project included stadium expansions and…
Birmingham News Building
NAFCO fabricated and delivered the entrance façade and the interior bridges that connected the two individual office areas for this landmark building. Originally built for…
Koch Petroleum Coke
NAFCO detailed, fabricated and delivered twelve, 10′ diameter, 40′ long tubular gallery sections and the associated supports to Long Beach, CA for Koch Minerals. NAFCO…
Smithfield Foods
This train unloading conveyor system for Smithfield Foods at their Rose Hill, NC facility for the purpose of unloading and trucking feed. The project consisted…
Mercedes-Benz Stadium
NAFCO was a subcontractor to Canam Steel to complete over 3,000 tons of fabrication for the new Mercedes-Benz Stadium, home to the Atlanta Falcons. NAFCO…
Auburn University
In 2015 NAFCO worked with Auburn University to complete the fabrication and erection of the new Jordan-Hare Stadium Scoreboard, which is still the largest in…
Marshall Space Flight Center
NAFCO joined the mssions to Mars through the work completed for NASA’s test stands at the Marshall Space Flight Center in Huntsville, AL. This three…
Merrimack Power Station
NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project. The project consisted…
Kryger Creek Power Station
Material handling systems supporting Flue-gas desulfurization (FDG) installation consisting of Limestone Receiving Conveyor, LS Transfer Conveyors, LS Delivery Conveyors, Gypsum Waste Reclaim Conveyor and Gypsum…
Oxbow – Enid
In August 2014, Wolf Point Engineers & Contractors contracted with Oxbow Calcining LLC for complete engineering, procurement, installation and commissioning (EPC) for a new screening,…
Osprey Aircraft Hangars
NAFCO worked on multiple projects from 2003 through 2009 to detail, fabricate and erect hangars for Osprey Aircraft. These large hangars featured prismatic pipe trusses…
Tanner Medical Center
In 2011, NAFCO contracted to detail, fabricate and erect a major addition to the Tanner medical Center in Carrollton, Georgia. This project included additions to…
TPS Sand Plant
NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin. The project included two 48” conveyors with…
Protective Stadium
NAFCO continued to showcase our expertise in sports and stadium work with the detailing, fabrication and erection of the strutural and miscellaneous scopes for Protective…
Solar Panel Production Facility
NAFCO was selected to detail, fabricate and erect this production warehouse in Trinity, AL. The project includes over 2,400,000 square feet under roof, over 6,000…
Trilith Studios
NAFCO worked with an industry partner to provide fabrication and just-in-time delivery of roof trusses essential to the success of the project schedule. Stats Location:…
Ford – Tennessee Electric Vehicle Center
NAFCO procured, fabricated and delivered over 250 roof trusses for erection in the new Tennessee Electric Vehicle Center. Trusses were staged and delivered “to-the-hook” for…
US Geological Survey Headquarters
NAFCO is working with Brasfield & Gorrie, LLC to detail, fabricate and erect the new USGS headquarters in Tuscaloosa, AL. This unique project will feature…
Confidential Client
NAFCO provided fabrication and erection for this warehouse expansion project, totalling over 1,600 tons. Building columns of over 95′ tall and long span roof trusses…
Project 904
NAFCO has worked closely with our clients, the design team and the project owner to fabricate and erect this 4,500+ ton project. Three-projects-in-one, NAFCO worked…
Brother Bryan Mission Renovation
NAFCO’s team worked with one of our local misssions partners, Brother Bryan Missions, to provide structural and miscellaneous steel fabrication and erection to help serve…
Assembly Yard Studios
NAFCO fabricated 1,250 tons of long-span roof trusses for these filming studios near Atlanta, GA. We were able to provide just-in-time delivery of 114 roof…
Hunter Army Air Field Hangar
This hangar project on Hunter Army Air Field features deep, long span trusses running perpindicular to one-another. NAFCO used a mix of shop and field…
Shuttle Conveyor Replacement for Ship Loader
A 95’ box truss shuttle conveyor was fabricated in two sections and shipped to Redwood City, California where it was spliced and retrofitted into an…
Emory Winship Pedestrian Bridge
NAFCO fabricated and delivered this fully architecturally exposed pedestrian bridge to the heart of Atlanta for Emory University hospitals. The project features custom-milled, solid steel…
20 Midtown
NAFCO provided detailing, fabrication and erection of structural and miscellaneous steel for the 20 Midtown project. The luxury apartment community in downtown Birmingham allowed NAFCO…
VA Clinic in Orangeburg, SC
NAFCO detailed, fabricated and erected the VA Hospital Clinic in Orangeburg, SC in 2020. Stats Location: Orangeburg, SC In Service: 2021 Total Tons: 100 Gallery
SteelRidge Center
Start-to-finish, NAFCO provided turnkey architectural coordination, structural engineering, detailing, fabrication, coating and erection of our corporate headquarters in Birmingham, AL. The steel-framed building features architecturally…
Sooner Generation Plant Conveyor Replacement
NAFCO and Wolf Point Engineers worked together to fully engineer, procure and construct the conveyor 10 and 11 replacements at Sooner Generation Plant. NAFCO detailed,…
Zen-Noh Lift Bridge
NAFCO’s Birmingham engineering team worked with our customers to fully design this lift bridge in Convent, LA. Our scope of work included structural and mechanical…
Arch Coal, Inc.
In 2011, we were contracted to detail and fabricate all the required structural steel for a new preparation plant and load out facility. This included…
Destin Commons
In 2003, we completed the fabrication and erection of the structural steel for the Destin Commons retail center project in the coastal resort of Destin,…
Department of Navy, US Marine Corps
In 2004, we completed the fabrication and erection of a prismatic truss hangar, utilizing large-sized steel pipe, for the Department of the Navy in Norfolk,…
Cliff’s Natural Resources
In 2011, we contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by…