TPS Sand Plant

NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin.  The project included two 48” conveyors with transfer towers, screening building, and associated chutework.  The project included 1,600 tons of steel with a two coat sophisticated paint system applied for corrosion protection.  (See Pictures from WPE W…

Shuttle Conveyor Replacement for Ship Loader

A 95’ box truss shuttle conveyor was fabricated in two sections and shipped to Redwood City, California where it was spliced and retrofitted into an existing structure as a ship loader at a scrap metal facility. Additional supports and new platforms were added to the existing structure due to the clients request for a new…

Sooner Generation Plant Conveyor Replacement

NAFCO and Wolf Point Engineers worked together to fully engineer, procure and construct the conveyor 10 and 11 replacements at Sooner Generation Plant. NAFCO detailed, fabricated, assembled and staged structural steel and over 2,100 feet of 12.5′ diameter tubular galleries containing two 36-inch conveyors to support a ten week outage installation. During the ten weeks,…

Zen-Noh Lift Bridge

NAFCO’s Birmingham engineering team worked with our customers to fully design this lift bridge in Convent, LA. Our scope of work included structural and mechanical design, steel fabrication, shop assembly of mechanical components, multi-coat painting and delivery. Stats Location: Convent, LA In Service: 2018 Total Tons: 75 Gallery