In 2011, NAFCO contracted to detail, fabricate and erect a major addition to the Tanner medical Center in Carrollton, Georgia. This project included additions to several different areas with tie-ins to the existing structure. Stats Location: Carrollton, GA In Service: 2011 Total Tons: 400 Gallery Project navigationPreviousPrevious project:TPS Sand PlantNextNext project:Kryger Creek Power Station
Schenck SilosEngineering, Industrial Steel Fabrication, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Turnkey Design
Naheola Biomass DuctworkEngineering, Industrial Steel Fabrication, Preconstruction & Design-Assist, Structural Steel Fabrication & Erection, Turnkey Design
CPS EnergyIndustrial Steel Fabrication, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Structural Steel Fabrication & Erection, Turnkey Design
Cliff’s Oak GroveIndustrial Steel Fabrication, Miscellaneous Steel, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Structural Steel Fabrication & Erection
Cliff’s Bloom LakeIndustrial Steel Fabrication, Miscellaneous Steel, Sophisticated Paint Systems, Structural Detailing Services
Bryant Denny Stadium RenovationsStructural Detailing Services, Structural Steel Fabrication & Erection
Birmingham News BuildingMiscellaneous Steel, Structural Detailing Services, Structural Steel Fabrication & Erection
Koch Petroleum CokeIndustrial Steel Fabrication, Sophisticated Paint Systems, Structural Detailing Services
Smithfield FoodsIndustrial Steel Fabrication, Miscellaneous Steel, Sophisticated Paint Systems, Structural Detailing Services
Auburn UniversityPreconstruction & Design-Assist, Sophisticated Paint Systems, Structural Steel Fabrication & Erection