NAFCO provided fabrication and erection for this warehouse expansion project, totalling over 1,600 tons. Building columns of over 95′ tall and long span roof trusses were the key feature of the project. Stats Location: Merrit Island, FL In Service: 2023 Total Tons: 1,600 Gallery Project navigationPreviousPrevious project:SteelRidge CenterNextNext project:TPS Sand Plant
Schenck SilosEngineering, Industrial Steel Fabrication, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Turnkey Design
Naheola Biomass DuctworkEngineering, Industrial Steel Fabrication, Preconstruction & Design-Assist, Structural Steel Fabrication & Erection, Turnkey Design
CPS EnergyIndustrial Steel Fabrication, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Structural Steel Fabrication & Erection, Turnkey Design
Cliff’s Oak GroveIndustrial Steel Fabrication, Miscellaneous Steel, Preconstruction & Design-Assist, Sophisticated Paint Systems, Structural Detailing Services, Structural Steel Fabrication & Erection
Cliff’s Bloom LakeIndustrial Steel Fabrication, Miscellaneous Steel, Sophisticated Paint Systems, Structural Detailing Services
Bryant Denny Stadium RenovationsStructural Detailing Services, Structural Steel Fabrication & Erection
Birmingham News BuildingMiscellaneous Steel, Structural Detailing Services, Structural Steel Fabrication & Erection
Koch Petroleum CokeIndustrial Steel Fabrication, Sophisticated Paint Systems, Structural Detailing Services
Smithfield FoodsIndustrial Steel Fabrication, Miscellaneous Steel, Sophisticated Paint Systems, Structural Detailing Services
Auburn UniversityPreconstruction & Design-Assist, Sophisticated Paint Systems, Structural Steel Fabrication & Erection